Adelgate Tower

Multi storey Office Block

London

Scope of Works: Supply, Installation, testing & commissioning of the building services inclusive of power, smart lighting, containment, mechanical supplies, generator & fuel storage wiring.


What was required: The project would aim to deliver 16 floors of grade A office space as part of the regeneration of the Aldgate area. The build would included basement plant rooms and roof PV system.


What We Delivered: Working within a 15 month program AES were responsible for the complete works to the electrical core as well as both basement and roof plant rooms. AES were also responsible for containment for all specialist systems Photo Voltaic, Security & Life Safety.

66 Queen Square, Bristol

Multi Storey Office Block

Bristol

Scope of Works: Supply, Installation, testing & commissioning of the electrical building services inclusive of power, smart lighting, data, fire alarms & containment.


What was required: CAT B fit out to a very high specification consisting of meeting rooms, private offices, in house kitchen, breakout spaces & open work areas for the new flagship office for new occupant KPMG.


What We Delivered: By adhering to a very fast paced program we assisted in delivering the finished project on time and to a very high standard while incorporating changes to the listed building area of this project.

Bath University Student Accomodation

Student Accomodation

Twerton Mill, Bath

Scope of Works: Design, Supply, Installation, testing and commissioning of the electrical & communications services inclusive of lighting, power, containment, access control & life also include safety systems.


What was required: The project would consist of a 330 bedroom student accommodation complex, that would be delivered though a mixture of townhouses, studio and cluster flats. The build would also include student common areas and laundry room.


What We Delivered: AES completed the project ahead of time ready for the new influx of Bath University students, we even assisted during the moving in process to ensure the new students were familiar with the systems of their new homes.

Tesco Project Heart

Offices and Kitchens

Welwyn Garden City

Scope of Works: Supply, Installation, testing & commissioning of the electrical building services inclusive of power, smart lighting & containment.


What was required: The project would aim to deliver a new staff academy for Tesco’s in the centre of their office campus in Welwyn Garden City. The building would consist of meeting rooms, a large conference area, classrooms for Tesco culinary academy, multiple kitchens and taste rooms.


What We Delivered: By sticking to a very in depth and strict program we assisted in delivering the finished project in line with the original program finish date despite a complete design overall part way through the project.

RUH Bath Pathology & Morgue

Offices

Bath

Scope of Works: Supply, Installation, testing & commissioning of the electrical building services and an external roof plant room.


What was required: A new £12m pathology and mortuary will provide the RUH with a first class facility finished to a very high specification. Including a new refrigerated stores and autopsy theatre with an observation gallery, also accommodating 120+ staff who will work in the surrounding labs and pharmacy.


What We Delivered: AES completed a full electrical installation to comply with NHS standards while sticking to the very high Heath & Safety policies that the NHS apply. The project was delivered on time which was paramount to this project.

COLT Data Hall 15 to 24, Welwyn Garden City

Data Centre

Welwyn Garden City

Scope of Works: Supply, Installation, testing & commissioning of the electrical services within Battery rooms, UPS rooms, Main internal data hall, back of house maintenance area and linked corridor to exiting data halls.
AES were responsible for small power, lighting, specialist data containment & earthing systems.


What was required: The project would aim to deliver two new data halls at its flagship London North data centre. The requirement of the new data halls came at the request of COLT’s longstanding confidential clients and due to rate of growth in the data sector it was vital that this project was completed expediantly without any room for compromise on quality.


What We Delivered: AES worked very closely with the main contractor to deliver this project in line with the original aims and based on how successful the project was COLT awarded the main contractor an additional 8 data halls, AES were proud that based on our previous commitments in producing a first rate Project, we were in turn awarded the 8 additional data halls, all of the Halls were delivered on time and to a great standard.
During the Project AES were awarded a number of Health and Safety awards.

COLT Data Hall 9 & 10 Upgrade, Welwyn Garden City

Data Centre

Welwyn Garden City

Scope of Works: Installation of new HV containment, generator containment, removal and redirection of existing services to an occupied data hall.


What was required: The project would aim to provide an upgrade to two existing data halls due to the increasing demand in power requirements, this would need to be delivered without causing any interruption to the existing client who was occupying the data halls.


What We Delivered: AES achieved what was set out by the main contractor while working with a start stop program and out of hours working to comply with the requirements of the occupying client..

Plot 1420, Gloucester Business Park

Offices and Car Park

Gloucester

Scope of Works: Supply, Installation, testing & commissioning of the electrical building services and large external carpark lighting.


What was required: The project would be the new flagship office of Horizon Nuclear Power UK, with over 60,000 square feet of flexible office space combined with a high security specification


What We Delivered: AES completed a full electrical installation with a high spec, works including LV distribution, intelligent lighting throughout the entire building, external feature lighting, car park lighting & specialist works including a smart electronic meeting room booking system & Electrical car charging points.

Cheltenham Borough Council Crematorium

Building and Car Park

Cheltenham

Scope Of Works: Supply, Installation, testing & commissioning of the electrical building services and external car park.


What was required: A new £8.5m crematorium to replace the original chapel that opened in 1938. Two new chapels and burners to replace the current facilities that are no longer fit for purpose. A tight budget was very important to this project.


What We Delivered: AES completed a full electrical installation to great standards with special care being made to ensure that the electrical finish was aesthetically pleasing.

Griffin Theatre – Rendcomb College, Cirencester

Bespoke Building

Cirencester

Scope Of Works: Supply, Installation, testing & commissioning of the electrical building services inclusive of power, lighting, data, fire alarms & containment.


What was required: A Brand new £3.3m Theatre that would lie in the heart of Rendcomb College’s campus. The theatre would be industry standard performance spaces including a dance studio with mirrored walls and sprung floor, this new, versatile venue will cater for all requirements, from performances to conferences, exhibitions and seminars.
Facilities include: 350-seat auditorium with orchestra pit, dance studio with sprung floor and mirrored walls, hospitality area with stunning views and a box office with a reception.


What We Delivered: Work would be completed during normal school hours so discretion was a high priority and by keeping to a very fast paced program we assisted in delivering the finished project on time and to the expected high standards.